Integrated Filing — IndAS



General information about company

Scrip Code 532708
NSE Symbol GVKPIL
MSEI Symbol NOTLISTED
ISIN INE251H01024
Name of company GVK POWER & INFRASTRUCTURE LIMITED
Type of company Main Board
Class of security Equity
Date of start of financial year 01-04-2025
Date of end of financial year 31-03-2026
Date of board meeting when results were approved 29-05-2026
Date on which prior intimation of the meeting for considering financial results was informed to the exchange 13-05-2026
Description of presentation currency INR
Level of rounding used in financial results Lakhs
Reporting Type Quarterly
Reporting Quarter Fourth quarter
Nature of report standalone or consolidated Standalone
Whether results are audited or unaudited for the quarter ended Unaudited
Whether results are audited or unaudited for the Year to date for current period ended/year ended Audited
Segment Reporting Single segment
Description of single segment Manpower & Consultancy Services
Start date and time of board meeting 29-05-2026   14:00:00
End date and time of board meeting 29-05-2026   16:30:00
Whether cash flow statement is applicable on company Yes
Type of cash flow statement Cash Flow Indirect
Declaration of unmodified opinion or statement on impact of audit qualification Statement on impact of audit qualification
Whether the company has any related party? Yes
Whether the company has entered into any Related Party transaction during the selected half year for which it wants to submit disclosure? Yes
(I) We declare that the acceptance of fixed deposits by the bans/Non-Banking Finance Company are at the terms uniformly applicable/offered to all shareholders/public NA
(II) We declare that the scheduled commercial bank, as per RBI circular RBI/DBR/2015-16/19 dated March 03, 2016, has allowed additional interest of one per cent per annum, over and above the rate of interest mentioned in the schedule of interest rates on savings or a term deposits of banks staff and their exclusive associations as well as on deposits of Chairman, Chairman & Managing Director, Executive Director or such other Executives appointed for a fixed tenure. NA
Whether the company is a high value debt listed entity according to regulation 15 (1A)? No
(a) If answer to above question is Yes, whether complying with proviso to regulation 23 (9), i.e., submitting RPT disclosures on the day of results publication?
(b) If answer to above question is No, please explain the reason for not complying.
Whether the updated Related Party Transactions (RPT) Policy (in compliance with Reg. 23 of SEBI LODR) has been uploaded on the website of the Company? Yes
Latest Date on which RPT policy is updated 28-05-2026
Indicate Company website link for updated RPT policy of the Company www.gvk.com
Whether statement on deviation or variation for proceeds of public issue, rights issue, preferential issue, qualified institutions placement etc. is applicable to the company for the current quarter? No
No. of times funds raised during the quarter
Whether the disclosure for the Default on Loans and Debt Securities is applicable to the entity? No
Not applicable



Financial Results Ind-AS

Amount in (Lakhs)

Particulars 3 months/ 6 months ended (dd-mm-yyyy) Year to date figures for current period ended (dd-mm-yyyy)
A Date of start of reporting period 01-01-2026 01-04-2025
B Date of end of reporting period 31-03-2026 31-03-2026
C Whether results are audited or unaudited Unaudited Audited
D Nature of report standalone or consolidated Standalone Standalone
1 Income
Revenue from operations 0.00 0.00
Other income 71.00 309.00
Total income 71.00 309.00
2 Expenses
(a) Cost of materials consumed 0.00 0.00
(b) Purchases of stock-in-trade 0.00 0.00
(c) Changes in inventories of finished goods, work-in-progress and stock-in-trade 0.00 0.00
(d) Employee benefit expense 3.00 12.00
(e) Finance costs 0.00 0.00
(f) Depreciation, depletion and amortisation expense 1.00 5.00
(f) Other Expenses
1 Other Expenses 76.00 20,065.00
2 Impairment of non-current investments/ Deemed investment 0.00 84,120.00
Total other expenses 76.00 1,04,185.00
Total expenses 80.00 1,04,202.00
3 Total profit before exceptional items and tax (9.00) (1,03,893.00)
4 Exceptional items 0.00 0.00
5 Total profit before tax (9.00) (1,03,893.00)
6 Tax expense
7 Current tax 38.00 38.00
8 Deferred tax 0.00 0.00
9 Total tax expenses 38.00 38.00
10 Net movement in regulatory deferral account balances related to profit or loss and the related deferred tax movement 0.00 0.00
11 Net Profit Loss for the period from continuing operations (47.00) (1,03,931.00)
12 Profit (loss) from discontinued operations before tax 0.00 0.00
13 Tax expense of discontinued operations 0.00 0.00
14 Net profit (loss) from discontinued operation after tax 0.00 0.00
15 Share of profit (loss) of associates and joint ventures accounted for using equity method 0.00 0.00
16 Total profit (loss) for period (47.00) (1,03,931.00)
17 Other comprehensive income net of taxes 0.00 0.00
18 Total Comprehensive Income for the period (47.00) (1,03,931.00)
19 Total profit or loss, attributable to
Profit or loss, attributable to owners of parent
Total profit or loss, attributable to non-controlling interests
20 Total Comprehensive income for the period attributable to
Comprehensive income for the period attributable to owners of parent
Total comprehensive income for the period attributable to owners of parent non-controlling interests
21 Details of equity share capital
Paid-up equity share capital 15,792.00 15,792.00
Face value of equity share capital 1 1
27 Details of debt securities
22 Reserves excluding revaluation reserve 0.00
23 Earnings per share
i Earnings per equity share for continuing operations
Basic earnings (loss) per share from continuing operations 0 -6.58
Diluted earnings (loss) per share from continuing operations 0 -6.58
ii Earnings per equity share for discontinued operations
Basic earnings (loss) per share from discontinued operations 0 0
Diluted earnings (loss) per share from discontinued operations 0 0
ii Earnings per equity share
Basic earnings (loss) per share from continuing and discontinued operations 0 -6.58
Diluted earnings (loss) per share from continuing and discontinued operations 0 -6.58
24 Debt equity ratio
25 Debt service coverage ratio
26 Interest service coverage ratio
27 Disclosure of notes on financial results



Remarks

Debt equity ratio
Debt service coverage ratio
Interest service coverage ratio


Statement of Asset and Liabilities

Amount in (Lakhs)

Particulars Year ended (dd-mm-yyyy)
Date of start of reporting period 01-04-2025
Date of end of reporting period 31-03-2026
Whether results are audited or unaudited Audited
Nature of report standalone or consolidated Standalone
Assets
1 Non-current assets
Property, plant and equipment 12.00
Capital work-in-progress
Investment property 18,097.00
Goodwill 0.00
Other intangible assets 0.00
Intangible assets under development
Biological assets other than bearer plants
Investments accounted for using equity method
Non-current financial assets
Non-current investments 0.00
Trade receivables, non-current
Loans, non-current 0.00
Other non-current financial assets
1 Other 14.00
Total of other non-current financial assets 14.00
Total non-current financial assets 14.00
Deferred tax assets (net)
Other non-current assets
1 Non current tax assets 360.00
Total of other non-current assets 360.00
Total non-current assets 18,483.00
2 Current assets
Inventories 0.00
Current financial asset
Current investments 1,196.00
Trade receivables, current 1.00
Cash and cash equivalents 4,432.00
Bank balance other than cash and cash equivalents 0.00
Loans, current 0.00
Other current financial assets
Total of other current financial assets 9.00
Total current financial assets 5,638.00
Current tax assets (net)
Other current assets
1 Other current assets 380.00
Total of other current assets 380.00
Total current assets 6,018.00
3 Non-current assets classified as held for sale
4 Regulatory deferral account debit balances and related deferred tax Assets
Total assets 24,501.00
Equity and liabilities
1 Equity
Equity attributable to owners of parent
Equity share capital 15,792.00
Other equity (34,252.00)
Total equity attributable to owners of parent (18,460.00)
Non controlling interest
Total equity (18,460.00)
2 Liabilities
Non-current liabilities
Non-current financial liabilities
Borrowings, non-current 0.00
Trade payables, non-current
(A) Total outstanding dues of micro enterprises and small enterprises
(B) Total outstanding dues of creditors other than micro enterprises and small enterprises
Total Trade payable
Other non-current financial liabilities
1 Unearned financial guarantee liability 2,695.00
Total of other non-current financial liabilities 2,695.00
Total non-current financial liabilities 2,695.00
Provisions, non-current 0.00
Deferred tax liabilities (net)
Deferred government grants, Non-current
Other non-current liabilities
Total of other non-current liabilities
Total non-current liabilities 2,695.00
Current liabilities
Current financial liabilities
Borrowings, current 36,427.00
Trade payables, current
(A) Total outstanding dues of micro enterprises and small enterprises 2.00
(B) Total outstanding dues of creditors other than micro enterprises and small enterprises 71.00
Total Trade payable 73.00
Other current financial liabilities
1 others 1,655.00
Total of other current financial liabilities 1,655.00
Total current financial liabilities 38,155.00
Other current liabilities 2,111.00
1 Other current liabilities 2,111.00
Total of other current liabilities 2,111.00
Provisions, current 0.00
Current tax liabilities (Net)
Deferred government grants, Current
Total current liabilities 40,266.00
3 Liabilities directly associated with assets in disposal group classified as held for sale
4 Regulatory deferral account credit balances and related deferred tax liability
Total liabilities 42,961.00
Total equity and liabilites 24,501.00
Disclosure of notes on assets and liabilities



Format for Reporting Segment wise Revenue, Results and Capital Employed along with the company results

Amount in (Lakhs)

Particulars 3 months/ 6 month ended (dd-mm-yyyy) Year to date figures for current period ended (dd-mm-yyyy)
Date of start of reporting period 01-01-2026 01-04-2025
Date of end of reporting period 31-03-2026 31-03-2026
Whether results are audited or unaudited Unaudited Audited
Nature of report standalone or consolidated Standalone Standalone
1 Segment Revenue (Income)
(net sale/income from each segment should be disclosed)
Total Segment Revenue
Less: Inter segment revenue
Revenue from operations
2 Segment Result
Profit (+) / Loss (-) before tax and interest from each segment
Total Profit before tax
i. Finance cost
ii. Other Unallocable Expenditure net off Unallocable income
Profit before tax
3 (Segment Asset - Segment Liabilities)
Segment Asset
Total Segment Asset
Un-allocable Assets null null
Net Segment Asset null null
4 Segment Liabilities
Segment Liabilities
Total Segment Liabilities
Un-allocable Liabilities null null
Net Segment Liabilities null null
Disclosure of notes on segments



Other Comprehensive Income

Amount in (Lakhs)

Particulars 3 months/ 6 months ended (dd-mm-yyyy) Year to date figures for current period ended (dd-mm-yyyy)
A Date of start of reporting period 01-01-2026 01-04-2025
B Date of end of reporting period 31-03-2026 31-03-2026
C Whether results are audited or unaudited Unaudited Audited
D Nature of report standalone or consolidated Standalone Standalone
Other comprehensive income [Abstract]
1 Amount of items that will not be reclassified to profit and loss
Total Amount of items that will not be reclassified to profit and loss
2 Income tax relating to items that will not be reclassified to profit or loss
3 Amount of items that will be reclassified to profit and loss
Total Amount of items that will be reclassified to profit and loss
4 Income tax relating to items that will be reclassified to profit or loss
5 Total Other comprehensive income



Cash flow statement, indirect

Amount in (Lakhs)

Particulars Year ended (dd-mm-yyyy)
A Date of start of reporting period 01-04-2025
B Date of end of reporting period 31-03-2026
C Whether results are audited or unaudited Audited
D Nature of report standalone or consolidated Standalone
Statement of cash flows
Cash flows from used in operating activities
Profit before tax (1,03,893.00)
Adjustments for reconcile profit (loss)
Adjustments for finance costs 0.00
Adjustments for decrease (increase) in inventories 0.00
Adjustments for decrease (increase) in trade receivables, current 58.00
Adjustments for decrease (increase) in trade receivables, non-current 0.00
Adjustments for decrease (increase) in other current assets (12.00)
Adjustments for decrease (increase) in other non-current assets 0.00
Adjustments for other financial assets, non-current 0.00
Adjustments for other financial assets, current 0.00
Adjustments for other bank balances 0.00
Adjustments for increase (decrease) in trade payables, current (8.00)
Adjustments for increase (decrease) in trade payables, non-current 0.00
Adjustments for increase (decrease) in other current liabilities 0.00
Adjustments for increase (decrease) in other non-current liabilities 0.00
Adjustments for depreciation and amortisation expense 5.00
Adjustments for impairment loss reversal of impairment loss recognised in profit or loss 84,120.00
Adjustments for provisions, current 0.00
Adjustments for provisions, non-current 0.00
Adjustments for other financial liabilities, current 0.00
Adjustments for other financial liabilities, non-current 0.00
Adjustments for unrealised foreign exchange losses gains 0.00
Adjustments for dividend income 0.00
Adjustments for interest income 0.00
Adjustments for share-based payments 0.00
Adjustments for fair value losses (gains) 0.00
Adjustments for undistributed profits of associates 0.00
Other adjustments for which cash effects are investing or financing cash flow 0.00
Other adjustments to reconcile profit (loss) 19,752.00
Other adjustments for non-cash items (76.00)
Share of profit and loss from partnership firm or association of persons or limited liability partnerships 0.00
Total adjustments for reconcile profit (loss) 1,03,839.00
Net cash flows from (used in) operations (54.00)
Dividends received 0.00
Interest paid 0.00
Interest received (227.00)
Income taxes paid (refund) 22.00
Other inflows (outflows) of cash 0.00
Net cash flows from (used in) operating activities (303.00)
Cash flows from used in investing activities
Cash flows from losing control of subsidiaries or other businesses 0.00
Cash flows used in obtaining control of subsidiaries or other businesses 0.00
Other cash receipts from sales of equity or debt instruments of other entities 0.00
Other cash payments to acquire equity or debt instruments of other entities 4.00
Other cash receipts from sales of interests in joint ventures 0.00
Other cash payments to acquire interests in joint ventures 0.00
Cash receipts from share of profits of partnership firm or association of persons or limited liability partnerships 0.00
Cash payment for investment in partnership firm or association of persons or limited liability partnerships 0.00
Proceeds from sales of property, plant and equipment 0.00
Purchase of property, plant and equipment 0.00
Proceeds from sales of investment property 0.00
Purchase of investment property 0.00
Proceeds from sales of intangible assets 0.00
Purchase of intangible assets 0.00
Proceeds from sales of intangible assets under development 0.00
Purchase of intangible assets under development 0.00
Proceeds from sales of goodwill 0.00
Purchase of goodwill 0.00
Proceeds from biological assets other than bearer plants 0.00
Purchase of biological assets other than bearer plants 0.00
Proceeds from government grants 0.00
Proceeds from sales of other long-term assets 0.00
Purchase of other long-term assets 0.00
Cash advances and loans made to other parties (1,602.00)
Cash receipts from repayment of advances and loans made to other parties 0.00
Cash payments for future contracts, forward contracts, option contracts and swap contracts 0.00
Cash receipts from future contracts, forward contracts, option contracts and swap contracts 0.00
Dividends received 0.00
Interest received 299.00
Income taxes paid (refund) 0.00
Other inflows (outflows) of cash 1.00
Net cash flows from (used in) investing activities 1,898.00
Cash flows from used in financing activities
Proceeds from changes in ownership interests in subsidiaries 0.00
Payments from changes in ownership interests in subsidiaries 0.00
Proceeds from issuing shares 0.00
Proceeds from issuing other equity instruments 0.00
Payments to acquire or redeem entity's shares 0.00
Payments of other equity instruments 0.00
Proceeds from exercise of stock options 0.00
Proceeds from issuing debentures notes bonds etc 0.00
Proceeds from borrowings 0.00
Repayments of borrowings 0.00
Payments of lease liabilities 0.00
Dividends paid 0.00
Interest paid 0.00
Income taxes paid (refund) 0.00
Other inflows (outflows) of cash 100.00
Net cash flows from (used in) financing activities 100.00
Net increase (decrease) in cash and cash equivalents before effect of exchange rate changes 1,695.00
Effect of exchange rate changes on cash and cash equivalents
Effect of exchange rate changes on cash and cash equivalents 0.00
Net increase (decrease) in cash and cash equivalents 1,695.00
Cash and cash equivalents cash flow statement at beginning of period 2,737.00
Cash and cash equivalents cash flow statement at end of period 4,432.00





Details of Impact of Audit Qualification

Amount in (Lakhs)

Whether results are audited or unaudited Audited
Declaration of unmodified opinion or statement on impact of audit qualification Statement on impact of audit qualification
Auditor's opinion Qualified opinion
Declaration pursuant to Regulation 33 (3) (d) of SEBI (LODR) Regulation, 2015: The company declares that its Statutory Auditor/s have issued an Audit Report with unmodified opinion for the period on Standalone results
Sr No. Audit firm's name Whether the firm holds a valid peer review certificate issued by Peer Review Board of ICAI Certificate valid upto
1 T R CHADHA & CO Yes 30-09-2028


Financial details

Amount in (Lakhs)

Sr. Particulars Audited Figures (as reported before adjusting for qualifications) Adjusted Figures (audited figures after adjusting for qualifications)
1 Turnover / Total income 309.00 309.00
2 Total Expenditure 1,04,202.00 1,04,202.00
3 Net Profit/(Loss) (1,03,893.00) (1,03,893.00)
4 Earnings Per Share -6.58 -6.58
5 Total Assets 24,501.00 24,501.00
6 Total Liabilities 42,961.00 42,961.00
7 Net Worth (18,460.00) (18,460.00)


Audit qualification

Amount in (Lakhs)

Sr. Details of Audit Qualification Type of Audit Qualification Frequency of qualification For Audit Qualification(s) where the impact is quantified by the auditor For Audit Qualification(s) where the impact is not quantified by the auditor
Management's Views (i) Management's estimation on the impact of audit qualification (ii) If management is unable to estimate the impact, reasons for the same Auditors' Comments on (i) or (ii) above
1 Textual Information(1) Disclaimer of opinion Repetitive Textual Information(2) Textual Information(3) Textual Information(4) Textual Information(5)
2 Textual Information(6) Disclaimer of opinion Repetitive Textual Information(7) Textual Information(8) Textual Information(9) Textual Information(10)
3 Textual Information(11) Disclaimer of opinion Repetitive Textual Information(12) Textual Information(13) Textual Information(14) Textual Information(15)
4 Textual Information(16) Disclaimer of opinion Repetitive Textual Information(17) Textual Information(18) Textual Information(19) Textual Information(20)
5 Textual Information(21) Disclaimer of opinion Repetitive Textual Information(22) Textual Information(23) Textual Information(24) Textual Information(25)


Text Block

Textual Information(1) We draw attention to note 6 to the standalone financial results which states that as at March 31, 2026, GVKPIL had accumulated losses. The liabilities of the Company, considering the amounts not provided for are much higher than the assets of the Company. One of the subsidiary companies where the project has been terminated is following liquidation basis of accounting. The GVKPIL, its subsidiaries, Associates and Joint controlled entity (GVKPIL Group) has delayed/defaulted in repayments of loans and interest thereon and various loan accounts have been classified as non-performing assets by banks/ lenders including recall of loans /filing of cases under the Insolvency and Bankruptcy Code in certain cases. The Resolution Professional (RP) have also been appointed in certain subsidiaries, step down subsidiaries and Joint controlled entity by NCLT. There are various litigations going on. The GVKPIL has also provided guarantees and commitments and/or has undertaken to provide financial assistance on behalf of various entities and as further detailed in notes 8 and 9 (referring to notes on GVK Coal Developers (Singapore) Pte Limited and GVK Energy Limited) uncertainties are being faced by various projects such as delays / non development of coal mines in an overseas project where the Company has provided guarantees and commitments for the borrowings. Various guarantees given by GVKPIL and GVK Energy Limited (GVKEL) on behalf of their subsidiaries, associates and joint controlled entity have been invoked by the lenders. Further, the GVKPIL has been admitted into Corporate Insolvency Resolution Process (CIRP) vide NCLT order dated July 12, 2024 and order uploaded on the portal on July 15, 2024 (Insolvency Commencement Date). These factors indicate significant doubt on going concern ability of the GVKPIL. Notwithstanding the above, the financial results of the GVKPIL have been prepared on going concern basis as management believes that the outcome of the CIRP shall keep the company as going concern. Considering the various uncertainties involved as fully described in the Basis of Disclaimer section of our report, the probable impact could be material and pervasive on these standalone financial results and that may cause significant doubt on companys ability to continue as a going concern. Accordingly, we are unable to comment that the management assumption of preparing these financial results on going concern basis is appropriate.
Textual Information(2) Not applicable
Textual Information(3) Not applicable
Textual Information(4) Management believes that the GVKPIL Group would be able to ultimately meet its commitments, reduce debt by stake sale and the entities on whose behalf guarantees/ commitments have been extended would be able to meet their obligations. Further, the Management is confident that aforesaid entities would be able to win litigations, recover claims and will be able to reach an optimal solution with non-controlling shareholders and lenders etc. as required despite current challenges.
Textual Information(5) Not applicable
Textual Information(6) We draw attention to Note No 8 to the standalone Financial Results regarding GVK Coal Developers (Singapore) Pte. Limited, (GVK Coal Developers) (an associate) in which the GVKPIL has investments and has receivables aggregating to Rs.79,048 Lakhs and to whom the company along with others jointly and severally had given irrevocable and unconditional guarantee and commitments (CG) for loans up to aggregating to USD 1132.45 Million (Rs. 10,71,913 lakhs as on March 31,2026 ) of principal amount (GVKPIL itself guaranteed towards the repayment of limits which shall be lower of either 53.9% (including in respect of the Hedging Agreements if any) of all principal amounts outstanding under the finance documents or USD 692.61 Million) taken by the aforesaid associate Company part of which is collateralized by pledge of 155,587,500 (March 31, 2025: 155,587,500), 130,287,382 (March 31, 2025: 130,287,382) and 48,000,000 (March 31, 2025: 48,000,000) shares of GVK Energy Limited, GVK Transportation Private Limited and GVK Airport Developers Limited respectively for securing loan obtained by GVK Coal Developers (Singapore) Pte. Limited and has also undertaken to provide financial assistance of USD 3.11million (Rs.2944 Lakhs as on March 31,2026) with respect to which there are multiple significant uncertainties including outlook on the sector, non-achieving of financial closure and clearances for the project, concluding an appropriate solution with various stakeholders including lenders, and necessary environmental and regulatory clearances etc. The GVK Coal Developers current liabilities exceeded current assets by USD 3193 million (Rs.30,22,600 Lakhs) as of March, 2026.And accumulated losses as of March, 2026 USD 1982.10 (Rs 18,76,143 lakhs) (March 31, 2025: USD 1839 million (Rs.15,73,525 Lakhs) is based on audited special purpose consolidated financial statements of GVK Coal Developers (Singapore) Pte. Limited.



The GVK Coal Developers lenders filed a claim in the High Court of Justice Business and Property Courts of England and Wales Commercial Courts (England Court) on November 09, 2020 and have sought to recover the amounts advanced to GVK Coal Developers. The England court vide its order dated October 19, 2023 has crystalized the amount payable by the defendants (GVKPIL and other guarantors / stakeholders in GVK Coal Developers) at USD 2.19 billion including the amount towards interest. As per legal opinion obtained by the company, the order dated 19th October 2023 passed by the England court is not speaking order. It has also been opined that the Order dated 19.10.2023 cannot be enforced in India and is contrary to the substantive law of India and is also in violation of the principles of natural justice.



As per the GVKPIL management, several attempts were made by the company to have a solution with the lenders including an agreement dated March 23, 2017, wherein a non-binding framework solution was agreed upon for a settlement. Subsequently also there were several efforts to engage with the lenders to arrive at a settlement. The GVK Coal Developers having failed to repay debt obligation, ICICI bank has invoked CG of GVKPIL on Nov 02, 2020 and demanding to pay the GVK Coal Developers dues.



Further, one of the lenders have filed an application under section 7 of the Insolvency and Bankruptcy Code 2016 to initiate Corporate Insolvency Resolution Process (CIRP) against the company (being guarantor for loan taken by GVK Coal Developers) before National Company Law Tribunal (NCLT), Hyderabad on July 14, 2022 and NCLT has admitted the Company into CIRP vide Order dated July 12, 2024. Interim Resolution professional (IRP) appointed by the Honble NCLT and IRP has taken the possession of all assets of GVKPIL. As approved by NCLT vide its order dated September 05, 2024, IRP has been confirmed as Resolution Professional (RP) of the Company.



RP has received claims to the extent of Rs. 21,79,248 Lakhs from the Financial Creditors (Including claim of Rs. 18,83,145 Lakhs from Financial Creditors of GVK Coal Developers) and RP has admitted the claims to the extent of Rs.15,94,489 Lakhs (Including claim of Rs. 14,89,486 Lakhs from Financial Creditors of GVK Coal Developers) for CIRP purpose as per IBC rules and balance Rs.5,84,760 Lakhs (Including claim of Rs. 3,93,670 Lakhs from Financial Creditors of GVK Coal Developers) claims are not admitted. The Resolution professional has invited Resolution Plans and resolution plans were received from two Prospective Resolution Applicants (PRA). However, Committee of Creditors (CoC) has rejected the two resolution plans as non-compliant / non-responsive. Thereafter, the CoC resolved to re-initiate the CIRP process of the Corporate Debtor based on asset-wise sale approach under Regulations of the CIRP which will be considered by Committee of Creditors (CoC) and actual liability ultimately payable by the Company shall be determined in accordance with the approved resolution plan and applicable orders under the IBC. Therefore, no accounting impact is given in the books of account and no provision has been made against admitted claims in the Standalone Financial results.



While the GVKPIL has made a provision for impairment in respect of the aforesaid investment and receivables aggregating to Rs.79,048 Lakhs, no provision has been made towards the Corporate Guarantee issued by GVKPIL in respect of which the above-mentioned claims are made by the financial creditors to the extent of Rs. 14,89,486 Lakhs admitted by the RP and the final outcome of the CIRP is pending. Considering the various uncertainties and complexities involved as mentioned above, we are unable to comment on the viability of the GVK Coal project and the additional provision that may be required concerning the aforementioned guarantees and commitments made by the GVKPIL and the resultant impact of the same on these standalone financial results.

Textual Information(7) Not applicable
Textual Information(8) Not applicable
Textual Information(9) The Company has already made provision for impairment in respect of its entire investment and receivables in GVK Coal Developers (Singapore) Pte. Limited aggregating to Rs 79,048 lakhs. The qualification relates to corporate guarantee and commitments issued by the Company in respect of borrowings availed by GVK Coal Developers, for which claims have been filed by the lenders and admitted by the Resolution Professional for CIRP purposes. The Company had made several attempts to arrive at an amicable settlement with the lenders, including a non-binding framework solution dated March 23, 2017, followed by subsequent correspondence and revised settlement proposal, the last such communication being dated January 12, 2021. Further, the Company is presently under CIRP pursuant to the order of the Honble NCLT, Hyderabad dated July 12, 2024. The final liability, if any, in respect of admitted claims shall be determined in accordance with the approved resolution plan and / or applicable orders under the IBC. Considering the significant uncertainties involved, including outcome of CIRP, treatment of admitted claims under the resolution plan, settlement with lenders, legal position regarding enforceability of the overseas court order in India, and viability / resolution of the GVK Coal project, the management is unable to estimate the financial impact of the qualification at this stage.
Textual Information(10) Not applicable
Textual Information(11) As discussed in detailed in Note 9(b) to the standalone financial results regarding annulment of settlement by Edelweiss and ARCIL with respect to their loans / NCDs to GVKEL and Alaknanda Hydro Power Company Limited (AHPCL), non-accounting of estimated increase in liability on account of annulment of settlement terms by Edelweiss (amount not ascertained), invocation and transfer by Edelweiss of 46,60,11,000 Equity shares of AHPCL held by GVKEL of Rs.10 each, recording of exceptional loss of Rs.19,486 lakhs during the year ended March 31, 2023 by GVKEL on account of invocation of pledged shares and transfer by Edelweiss (being difference in face value of pledged shares invoked by Edelweiss and the liability of Edelweiss appearing in books of GVKEL and AHPCL), recording of discharge of liability of Edelweiss pending legal suit before Honble Delhi High Court, wherein GVKEL pleaded that as a consequence of the invocation and transfer of a valuable asset, GVKEL liability towards the loan has been discharged and since the value of share is far in excess of the outstanding loan liability, the excess share to be returned. Next hearing of the case is scheduled on September 07, 2026.



On 9 October 2023, AHPCL, GVKEL and GVKPIL entered into a fresh Rs 33,000 lakh settlement at 12.5% interest but could not comply fully and obtained extensions till 31 July 2024. Of this, Rs 20,000 lakh was arranged by the lead lender and Rs 13,000 lakh paid by the companies. Later, Edelweiss and ARCIL assigned the facilities to Phoenix ARC. Phoenix ARC filed claims for Rs 116,399 Lakh, the RP admitted claims of Rs 1,05,003 lakh against the company, with no provision has been made in the books of account pending resolution plan approval.



Since the GVKEL has been admitted into CIRP, the GVKPIL has impaired value of investments and loans to GVKEL of Rs 84,120 lakhs and 19,690 lakhs respectively during the year ended March 31,2026.



In view of the same, we are unable to comment on the accounting done in this regard in books of account and the ultimate impact of the same including of the invocation of the settlement offer by Edelweiss, invocation of pledged shares of AHCPL by Edelweiss, invocation of corporate guarantee issued by the GVKPIL and GVKEL impact of the proceedings in the NCLT, impact of the assignment of facilities by Edelweiss and ARCIL to Phoenix ARC, the ongoing CIRP process and the additional liability that may arise in this regard if any on the Standalone financial results.

Textual Information(12) Not applicable
Textual Information(13) Not applicable
Textual Information(14) As given
Textual Information(15) Not applicable
Textual Information(16) 4. Note 13 to the standalone financial results regarding investigation by various Government agencies on various alleged irregularities relating to conflict of interest, misuse of funds, money laundering and other matters, pending completion of which and non-provision of certain related information sought from the company by us including complete copy of the Enforcement Directorate complaint. CBI has filed a charge sheet before the Chief Metropolitan Court, Mumbai on February 09, 2023, laying as allegation under section 120B read with section 420 of IPC against Mumbai International Airport Limited (MIAL), Vice Chairman & erstwhile CFO of the Company and four other GVKPIL group companies apart from others. The Court has granted bail to all the accused. The main issue alleged is siphoning of fund of MIAL eventually causing a loss to Airport Authority of India (AAI). Vide order dated 08.12.2023, fresh cognizance of offences in the chargesheet has been taken again and accused persons have been summoned. However, the said order has been currently stayed by the Ld. Sessions Court, Mumbai in revision petitions preferred by various accused persons and therefore, the proceedings are currently stayed in the matter and matter will resume only once the stay order gets vacated by the Revision Court. The company is of the view that the case will not stand the test of scrutiny of the court and will eventually be dismissed. The company is also of the view that the charges are unsubstantiated and no offence u/s section 420 IPC has been made out as there is no loss to AAI, Government, or any Tax Authorities as alleged. Next date before Sessions Court in the revision petitions is June 15,2026.



In addition to be above, the Enforcement Directorate (ED) had also taken up the investigation under the Prevention of Money Laundering Act (PMLA) on the basis of an FIR registered by the CBI. ED had filed a complaint in April 2021 on the same matters against the above-mentioned parties and some of the subsidiaries, joint ventures and step-down subsidiaries of the Company, their directors and officers. ED had filed a complaint before the City Court and Additional Session Judge, Greater Bombay under Section 45 of Prevention of Money Laundering Act, 2002 for commission of offence of Money laundering under section 3, read with section 70, Punishable u/s 4 of the Prevention of Money Laundering Act, 2002. The matter is currently at stage of adjudication of application on behalf of Accused-4 seeking supply of all the un relied documents and un relied statement u/s 50 PMLA and is fixed for filing reply of Enforcement Directorate on June 19, 2026.



The Audit Committee of the Company, based on the legal advice received by the Audit committee of Mumbai International Airport Limited (MIAL), have decided not to proceed with any independent investigation on the matters mentioned in the FIR or the complaint filed by ED. Considering the status of the proceedings with cases related to CBI and ED, the implications, if any, that may arise on the GVKPIL can't be ascertained and the impact if any of the same on the standalone financial results cannot be commented upon.



Textual Information(17) Not applicable
Textual Information(18) Not applicable
Textual Information(19) Investigations by various agencies are completed and charge sheets filed. The

ultimate outcome is subject to Judicial scrutiny and hence the impact of the same is

not ascertainable.



Textual Information(20) Not applicable
Textual Information(21) We draw attention to Note 12 to the standalone financial results regarding GVK Perambalur SEZ Private Limited (GVK SEZ), a wholly owned subsidiary company. GVK SEZ has Investment Property having book value of Rs.11,655 Lakh as on 31st March 2026. GVK SEZ stood as a Guarantor and mortgaged its land having book value as mentioned above (admeasuring 2,506.25 Acres) to Syndicate Bank (since merged with Canara Bank) on account of loans taken by GVKPIL. GVKPIL has since repaid the loan taken from Canara Bank and the bank has also acknowledged the same. However, Canara bank has not issued a no due certificate and has not returned the original title documents by exercising the right of general lien under section 171 of Indian Contract Act,1872 and has enforced general lien over the title deeds in the name of GVK SEZ for liabilities of GVK Coal (Singapore) PTE Ltd, an associate of GVKPIL. GVKPIL and GVK SEZ have jointly filed writ petition before High Court, Telangana on October 27, 2021, stating that Bank exercising of general lien under section 171 of the Indian Contract Act, 1872 is wholly misconceived and illegal and contrary to the terms of Guarantee extended by the GVK SEZ and the matter is yet to be listed. GVKPIL has obtained independent legal opinion based on which the outcome of the subject matter will be positive and the bank will be directed to release the documents given as security. Further, Enforcement Directorate (ED) had initiated provisional attachment proceedings in respect of the said land property under the Prevention of Money Laundering Act (PMLA). However, Honble High Court of Telangana vide its order dated April 22, 2021 has stayed the proceedings by issuing Show Cause Notice to ED. As on March 31, 2026, the status remains the same. The matter is under litigation. Pending these litigations, the recoverability of the investments made by GVKPIL in GVKSEZ of Rs.10,928 Lakhs is not determinable.



Textual Information(22) Not applicable
Textual Information(23) Not applicable
Textual Information(24) At present the matter is subject to Judicial scrutiny and hence the impact of the same is not ascertainable.
Textual Information(25) Not applicable


Signatories detail

Name of CEO / Managing director NOT APPPLICABLE
Name of CFO SANJEEV KUMAR SINGH
Name of audit committee chairman NOT APPPLICABLE
Name of statutory auditor SESHU SAMUDRALA
Name of other signatory, if any, with designation P V PRASANNA REDDY, WHOLE TIME DIRECTOR
Place HYDERABAD
Date 29-05-2026


Amount in (Lakhs)

Format for Disclosure of Related Party Transactions (applicable only for half-yearly filings i.e., 2nd and 4th quarter)

Sr No. Additional disclosure of related party transactions - applicable only in case the related party transaction relates to loans, inter-corporate deposits, advances or investments made or given by the listed entity/subsidiary. These details need to be disclosed only once, during the reporting period when such transaction was undertaken.
Details of the party (listed entity/subsidiary) entering into the transaction Details of the counterparty Type of related party transaction Details of other related party transaction Value of the related party transaction as approved by the audit committee Remarks on approval by audit committee Value of the related party transaction ratified by the audit committee Date of Audit Committee Meeting where the ratification was approved Value of transaction during the reporting period In case monies are due to either party as a result of the transaction In case any financial indebtedness is incurred to make or give loans, inter-corporate deposits, advances or investments Details of the loans, inter-corporate deposits, advances or investments Notes
Name PAN Name PAN Relationship of the counterparty with the listed entity or its subsidiary Opening balance Closing balance Nature of indebtedness (loan/ issuance of debt/ any other etc.) Details of other indebtedness Cost Tenure Nature (loan/ advance/ intercorporate deposit/ investment ) Interest Rate (%) Tenure Secured/ unsecured Purpose for which the funds will be utilised by the ultimate recipient of funds (endusage)
1 GVK Power & Infrastructure Limited Crescent EPC Projects and Technical Services Limited Within GVK Group Any other transaction Loan return NA 1,609.00 1,800.00 191.00
2 GVK Power & Infrastructure Limited Alaknanda Hydro Power Company Limited Within GVK Group Any other transaction Lease rent NA 3.00 3.00 0.00
3 GVK Power & Infrastructure Limited TAJ GVK Hotels & Resorts Limited Within GVK Group Any other transaction Expenses NA 0.24 5.00 4.76
4 GVK Power & Infrastructure Limited Sanjeev Kumar Singh CFO Remuneration NA 6.00 6.00 0.00
5 GVK Power & Infrastructure Limited GVK PERAMBALUR SEZ PRIVATE LIMITED Subsidiary Any other transaction Loan given NA 3.00 26.00 23.00
Total value of transaction during the reporting period 1,621.24